Skylake Sions "Portable Young Bird Racing Loft"
Page 1 Page 2 Page 3 Page 4 Page 5 Page 6 Page 7
Here the trusses are being screwed together.
The back portion of the roof is next is lifted into place and then the 2 halves are screwed together. This is my good friend and loft manager Carlos Sanchez screwing the trusses together. He can do it all!
A view of the front of the loft with the loading door at bottom right , Right is a view of a door latch I made that opens and closes the door from both the inside and outside the loft. It really works slick!